Projects

Electrical high voltage transformer, for a Plant treatment wasted water of Prades for the Catalan Agency of Water (ACA).

2014-06-30T15:21:58+00:00June 30th, 2014|Categories: Energy distribution, Projects, Studies, reports and energy certifications|

Electrical Project of the main supply electrical transformer and distribution electrical grid, aerial and underground 25 KV line to supply the new Plant treatment wasted water of Prades for the Catalan Agency of Water (ACA). Owner: Agència catalana de l’aigua. Place: Municipality.   Prades Date: December 2009 http://www.gencat.cat/aca

Energy Audit for buildings and public facilities

2014-06-30T15:59:41+00:00June 2nd, 2014|Categories: Legalization of facilities and activities, Projects|

ETECNIC has made some energy audit in locations such as La Fatarella, Capçanes, La Morera de Montsant, Pallaresos, Banyeres del Penedès or El Catllar. The works made, consist in an energy inspection, study and analysis of a building, process or system with the porpoise of detecting any possible anomaly in their state, check the suitability of the contracted power, verify the consumption and [...]